What do we propose?
Advance the steam turbine start-up ensuring the quality of the injected steam.
How do we do it?
By means of the SWAM AMI Deltacon DG SWAM analyzer
Where do we do it?
In any installation with water boiler and/or steam turbine
What do we get?
Eliminate the influence of CO2 on the acid/cation conductivity measurement.
Success stories
Eliminate the influence of CO2 on the acid/cation conductivity measurement.







